Project Cases
- Description
-
Project name: Mechanical and electrical installation and decoration project of 6# test workshop of Huzhou Lithium Battery Phase II
Owner name: Tianneng New Energy (Huzhou) Co., Ltd.
Project industry sector: New energy
Project scale: Building area 4300㎡, purification area 1500㎡
Purification level: Highest level 100,000Tianneng New Energy (Huzhou) Co., Ltd.'s annual production of 7GWh power storage lithium battery industrialization project is located in the Nan Taihu New District, Huzhou City, Zhejiang Province. The mechanical and electrical installation and purification decoration project of Tianneng Huzhou Lithium Battery Phase II 6# test workshop includes decoration engineering, water supply and drainage professional engineering, HVAC professional engineering, power pipeline engineering, electrical engineering, and comprehensive factory engineering.
项目名称:湖州锂电二期6#测试车间机电安装及装修工程
项目所属行业板块:新能源
项目实施周期:2024年9月~2024年12月
项目规模:建筑面积10008㎡,净化面积
净化等级:最高十万级