Project Cases
- Description
-
Project name: Changshu Yinhe Base, Xinneng Base Mechanical and Electrical General Contracting Project and Secondary Distribution Project
Owner Name: Jiangsu Zhengli Xinneng Battery Technology Co., Ltd.
Project Industry: New Energy - Lithium Battery Cell Factory
Project Scale: Construction Area 200,000㎡, Purification Area 150,000㎡
Purification Level: 10,000 Class (Low Dew Point -45℃)Jiangsu Zhengli Changshu Yinhe Base and Xinneng Base projects are fully automated dust-free production workshops, using fully automated equipment for loading and unloading, which can achieve high efficiency, high quality, and complete product production and digital full-process control, ensuring the traceability of product performance.
The project uses BIM technology throughout the entire process, with a 3D modeling accuracy of LOD300, which can be used for intuitive space management, facilitating overall planning and design, construction animation simulation, and project operation and maintenance management, saving a lot of time and labor costs for subsequent construction, and effectively ensuring that the project implementation is carried out in an orderly manner according to the time node.
项目名称:常熟银河基地、新能基地机电总包项目及二次配工程
项目所属行业板块:新能源—锂电池电芯厂房
项目实施周期:2021年12月~2022年12月
项目规模:建筑面积200000㎡,净化面积150000平方米
净化等级:万级(低露点-45℃)