  • Description
  • Project name: 1. Annual production of 8GW high-efficiency PERC solar cell production project 2. Jianhu Development Zone Photovoltaic Industrial Park Phase II Project EPC Project Production Plant Mechanical and Electrical Installation Package
    Owner Name: Jiangsu Runyang Photovoltaic Technology Co., Ltd.
    Project Industry Sector: New Energy - Photovoltaic Cell Workshop
    Project Scale: Construction Area 280,000㎡, Purification Area 220,000㎡
    Purification Level: Highest Class 1000

    Runyang Yangfu Jianhu Phase I is a 4GW photovoltaic cell project, including a 40,000 square meter purification plant production workshop and supporting auxiliary single buildings, including air conditioning purification, waste gas treatment, fire protection engineering, strong electricity, process pipelines, waste liquid drainage pipelines, structural ground, secondary distribution, etc.; the construction scope is from the velvet section to the detection of the film, and the outdoor supporting units include the fire pool room, explosion-proof chemical room, waste treatment room, etc.
    Runyang Yangfu Jianhu Phase II 14.2GW (full production can reach 17GW) TOP-CON solar cell project main plant electromechanical purification project, the purification plant area is 180,000 square meters, including air conditioning purification, strong electricity, process pipelines, structures, super wear-resistant AGV ground, secondary distribution, etc.; the construction scope is from the velvet section to the detection of the film.

项目名称:1.年产8GW高效PERC太阳能电池生产项目 2.建湖开发区光伏产业园二期工程EPC工程生产厂房机电安装包

项目所属行业板块:新能源—光伏电池车间

项目实施周期:2022年12月~2023年8月

项目规模:建筑面积280000㎡,净化面积220000平方米

净化等级:最高千级